MSSR for Equatorial Guinea

Installation, configuration support of the first Mono-pulse Secondary Surveillance Radar MSSR...


EQUATORIAL GUINEA

2014


Meteorological SMT Switching System

Installation, configuration, testing, training and commissioning of SMT switching system ...


ASECNA Countries

2014

Site Manager allocation for ATM system

Site manager allocation for ATM system including logistic and supervision during installation and configuration. ...


Equatorial Guinea

2014

MSSR's Radome assembling and tower erection

Radome assembling and tower erection for the first MSSR radar using section method...


Equatorial Guinea

2014

ILS radio links installation

ILS Radio links installation and commissioning between shelters and tower building...



Sudan

2014